The cost of carrying out an environmental impact assessment can be a significant part of the planning and design cost of a development project. Notoriously, the EIA costs are difficult to predict at the outset of the project. This uncertainty is mainly due to an initial lack of knowledge of the environmental baseline conditions on the development site. As the project progresses, site knowledge increases gradually and new costs may emerge while some risks may reduce. Particularly in the current economic climate, there is a need to have a clear understanding of the costs and the risks of the environmental impact assessment at an early stage in the project.

The first step to effective cost management of an environmental impact assessment is to carry out a thorough EIA scoping study. The outcome of the EIA scoping study should be a clear understanding of the basic site characteristics and the likely environmental risks and sensitivities. It should also provide a clear programme on how to address the issues that have been identified in the further environmental impact assessment.

Following a carefully undertaken EIA scoping study, uncertainties remain. These uncertainties are however much more manageable. For instance, during the EIA scoping study it was identified that no important archaeological features have been recorded in the wider area around a site. The following step that is proposed is to carry out a geophysical site survey. Depending on the outcome of the survey there may be a requirement to carry out an intrusive investigation in the form of an excavation.

There are three uncertainties that will determine the final cost for archaeological work as part of the environmental impact assessment. Firstly there is the uncertainty about the exact cost to carry out the geophysical survey. The error margin on this should be relatively small as it is a fairly defined activity. The second uncertainty relates to whether or not the results of the survey indicate the need of further work. This is a yes or no issue, where the uncertainty relates to the chance that further work is required. Finally, the third piece of uncertainty relates to the cost of the intrusive investigation should this be required.

A system that is based on the Monte Carlo cost forecasting system is ideally suited to deal with these kind of uncertainties. The outcome of the Monte Carlo cost forecasting system is typically a series of potential project costs together with the probability that each of these costs will not be exceeded. Thus, employing a combination of a rigorous EIA scoping study and the use of the Monte Carlo cost forecasting methodology are essential tools in the effective cost management of environmental impact assessments.

Environmental Statements – Addressing Contaminated Land Issues

Nov 01
2009

Under the relevant European Directives, an Environmental Statement is the formal product of an Environmental Impact Assessment. Environmental Statements are often organised in a way that describes the environmental baseline, mitigation and effects for each type of environmental receptors: ecology, water resources, archaeological resources, human beings etcetera. Contaminated land is often managed in the same ways as the various environmental receptor groups, although it is principally a cause of impacts rather than a receptor. It also often refers to a pre-existing condition and its damaging effect is on a variety of different receptors such as human health, structures and buildings, surface water features, groundwater features and ecology. This often means that land contamination specialists struggle with integrating the issue in a logical manner in an Environmental Statement. Sticking to the structured approach of an environmental statement is essential to ensure a clear description of the existing environmental condition, the potential impacts and the actions taken to avoid, minimise, offset or manage the impacts. This article is based on UK practice and legislation, although fundamentally the issues should be similar within other contexts.

Contaminated land is in many countries considered on a source-pathway-receptor basis. This is important to understand the impact land development can have on the issue of contaminated land. Development can interfere with any of these three elements. It can introduce sensitive receptors by changing the use of land, for instance by building new residential units on a site that was previously used for heavy industry. New pathways linking pre-existing contamination with an existing receptor can be formed, for instance when piling through a non-permeable layer connecting a layer of contaminated soils with a deep aquifer. Finally by introducing pollutants on the site a development project can introduce a potential source of contamination.

The second element to consider is the structured approach of an environmental statement. Apart from the introductory and procedural elements described in the environmental statement, a good environmental statement comprised the following sections:

environmental baseline conditions potential environmental impacts mitigating measures residual environmental impacts

There should be a logical relation between the different sections. Any receptor that is affected and described in the section about the potential impacts and effects should have been introduced in the section describing the baseline. Any material impact should be assigned a mitigation or management action etc. Implementing this structure allows a clear description and understanding of the environmental impacts and the way it will be managed.

Applying these principles to contaminated land will result in a baseline condition section that describes the current sensitive receptors that are present within the potential sphere of influence of the development, the sensitivity and importance of these receptors, the presence of any pre-existing contamination and the presence of actual and potential pathways. The next section, potential environmental impacts or effects, first considers the impacts that the development will have in terms of the introduction (or removal) of sensitive receptors and the creation of new pathways between existing and potential pollution sources and receptors. In addition this section will describe the potential environmental impacts that are associated with the introduction of new sources of contamination. In the third section, mitigating measures, a description of the actions to mitigate each of the impacts that may occur should be provided. Finally a statement of the residual impact of the development is provided in the last section: residual environmental impacts.